What makes a CNC supplier acceptable for aerospace hardware? Buyers in this field do not pay a premium for tight tolerances alone; they pay for a part that traces back to a specific heat of aluminum or titanium, cut under a proven process, and released with paperwork the prime contractor’s QA group accepts on first review. A shop that machines attractive-looking parts yet cannot produce a mill certificate per batch, a calibrated CMM report, and a route sheet tied to the part serial number will not survive a second purchase order. The checklist below covers what a buyer should verify before releasing even a small aerospace run, rather than the generic ISO 9001 items that apply to every machine shop.
Certification scope behind an AS9100 shop
Start with the certification, but read its scope carefully. AS9100 covers design, production, and final inspection for aviation components and serves as table stakes for a tier-two aerospace supplier. A shop holding ISO 9001 only can still make the parts, yet the buyer carries a heavier audit burden on their own side.
Ask for the certificate number and issue date, then confirm it on the issuer’s online directory; a laminated printout on an office wall proves nothing. Check whether the shop maintains NADCAP-accredited processes for any special operation required, such as chemical conversion, nondestructive testing, or heat treatment. If those processes are subcontracted, obtain the subcontractor’s NADCAP certification as well. The AS9100 versus ISO 9001 overview explains what the aerospace standard actually adds, and the aerospace quality standards guide lays out the documents primes expect on every purchase order.
Certification scope matters because a workshop can hold an AS9100 certificate that covers only machining, excluding heat treatment, coating, or other special processes the buyer may assume included. During an audit, the certificate scope clause reveals exactly which operations the quality system governs, and a buyer should compare that clause against the operations contracted on the purchase order. Shops maintaining separate quality records for aerospace lots often keep certified material on dedicated racks and prevent cross-mixing with general commercial stock, a practice visible through the routing traveler and material labels attached to each blank.
Material traceability from mill cert to finished part
Aerospace material control does not stop at the bar cutter. Ask the shop to demonstrate segregation: labeled racks, heat-number stickers that remain on the blank until the part ships, and a traveler carrying the heat number through every operation.
On delivery, each part should arrive with a copy of the mill test report tied to that heat. For aluminum 7075-T6 or titanium Ti-6Al-4V, the certificate lists chemical composition and mechanical properties, including tensile, yield, and elongation, and bears the mill’s stamp. If the shop cannot hand over a certificate matching the heat number engraved on the part, the material remains effectively untraceable and the part cannot ship to a flight application. Verify incoming inspection too: a shop that checks certificates against delivered material on receipt catches the rare bar mix-up before it becomes a nonconformance on the airframe.
Bar stock for aerospace work rarely shares floor space with general commercial steel. Labeled bins keep one heat separate from another, and the traveler follows every blank through milling, drilling, deburring, and final inspection so a finished part can match its source bar even after the original sticker wears away. Keeping a small retained sample from each approved lot gives future teams a reference for chemistry, hardness, and surface condition whenever a batch question arises during assembly or later maintenance.
Tolerance capability and inspection equipment
Aerospace parts commonly hold tolerances of ±0.01 to 0.025 mm on critical datums, positional callouts at MMC, and geometric controls such as profile, runout, and concentricity that a general shop ignores. The real question is not whether the shop can hold the number on a good day, but whether it can hold it on production run fifty, after tool wear, a shift change, and a temperature swing.
Request Cpk data on one or two critical features. A Cpk of 1.33 or better means the process remains centered and capable; a Cpk under 1.0 means the shop is firefighting every batch. Confirm the CMM software, probe calibration date, and that the inspection lab holds temperature at 20 ±1 °C. The CMM inspection guide explains how these machines are programmed and verified.
Temperature control around the CMM matters because thermal expansion shifts measured dimensions on aluminum and titanium even within a normal shop day. A machine maintained at a steady twenty degrees gives repeatable readings, while a work area near a door or heating unit can drift enough to move a ±0.02 mm feature out of tolerance between setup and final report. Probe calibration certificates, machine interval records, and staged inspection routines all support the traceability buyers need when the prime contractor audits the shipment package.
First article inspection and documentation package
Every new aerospace part needs a first article inspection, normally to AS9102, before the production run releases. The FAI package lists every drawing characteristic, measured value, tooling reference, and any nonconformance. On a ten-piece run the FAI usually covers the first part itself, fully dimensioned; for recurring production, a partial FAI covers only changed features.
Beyond the FAI, the buyer expects a dimensional report, material certificate, and route sheet. Part marking forms the last place buyers get surprised: flight hardware usually requires a permanent mark, by laser engraving, dot-peen, or electrochemical etch, carrying part number, revision, serial number, and heat or lot number. That mark must survive anodize or passivation and sit on a surface that does not interfere with assembly. The serial number engraving guide covers mark depth and legibility, while the CNC quality report article lists the documents expected on every shipment.
Questions to ask on the first aerospace RFQ
A few questions on the initial email save weeks of audit work later. Ask which heat numbers of 7075-T6 and Ti-6Al-4V the shop stocks, and whether it can ship the MTR with the first batch. Ask for the Cpk on a typical 0.01 mm positional feature, and whether statistical process control runs on critical features with an available control chart.
Ask how a nonconforming part enters a material review board with customer notification, and what the FAI turnaround measures in days. Vague answers, or a shop that has never heard of AS9102, signal that further candidates deserve consideration. The cheapest aerospace quote on a portal rarely proves cheapest when the first FAI returns incomplete and the program schedule slips for three weeks while the paperwork is redone.
Asking how nonconformance enters the material review board also reveals process maturity. A documented MRB path records the defect, proposed disposition, customer approval when required, and the corrective action that prevents recurrence, rather than letting a shop quietly rework a rejected feature without traceability. Buyers who establish these quality expectations before tooling or machining begin avoid disputes later over whether a minor dimensional deviation required notification, rejection, or concession approval.