A shipping box full of machined parts is not, by itself, a deliverable. The certificate packet that rides inside the box tells you whether the parts inside were cut from the alloy you paid for, held to the tolerances you drew, and inspected against the plan you approved. Some shops treat that packet as a courtesy. In regulated work, it is the product. This article walks through the documents worth asking for, what each one actually proves, and the questions that separate a real quality system from a folded printout.

Material certificates: the mill test report

The first document on the list is the material certificate, usually a Mill Test Certificate (MTC) to EN 10204 3.1 or an equivalent ASTM form. A 3.1 certificate is signed by the mill, states the heat number, and lists the actual chemical composition and mechanical properties of the batch you received. A 2.2 certificate, by contrast, is a general statement that the material meets the spec without heat-traceable values. For a non-critical bracket the 2.2 may be enough; for anything loaded, pressurized, or safety-related, ask for 3.1 and match the heat number on the certificate to the heat number marked on the bar stock. If the shop cannot show you the heat number on the raw bar before machining, you have no chain of custody. Our guide to material certificates for machined parts explains the difference between 2.1, 2.2, and 3.1 forms in more detail.

First article and dimensional inspection reports

For production lots, the First Article Inspection (FAI) report is the document that proves the first off tool was built to the drawing. A bare minimum FAI covers the critical dimensions; a full AS9102-style FAI captures every dimension on the print, with measurement method, nominal, tolerance, and actual reading. After the FAI is approved, ongoing parts usually ship with an inspection report on a sample or on 100 percent of the critical features, depending on what your quality agreement says. Ask up front whether the shop measures on a CMM, a height gauge, or a caliper, and which dimensions get CMM coverage. A bore held to +0.005/-0.000 mm on a CMM is a different animal from the same bore checked with a telescoping gauge. The first article inspection guide covers what a real FAI packet should contain.

Process and system certificates: ISO 9001 and beyond

ISO 9001:2015 is the baseline. It does not certify any individual part; it certifies that the shop runs a controlled process for document control, calibration, nonconformance, and corrective action. Ask for the certificate number and the accreditation body, then verify it online rather than trusting a scanned PDF on a sales deck. For aerospace or defense work, AS9100 adds traceability and special-process controls on top of ISO 9001. For medical, ISO 13485 adds risk management and design-control ties. If the shop holds ISO 9001 only, that is fine for industrial parts; if your part is medical or flight-critical, the wrong certificate on the wall will not pass your customer audit. Our overview of ISO 9001:2015 requirements lists the clauses that actually matter on the shop floor.

Coating and special-process certificates

Parts that leave the machine for anodizing, plating, passivation, or heat treatment carry their own certificates. A Type II anodize spec of 15-25 micrometers should come with a coating thickness report and a seal-quality test. Passivation of stainless should carry a bath-charge record per ASTM A967 or A380. Heat-treated parts need a hardness report and, when required, a case-depth reading. The trap is that many CNC shops outsource these processes; ask whether the certificate comes from the plater and whether the shop can tie the lot number on the certificate to the serial numbers on your parts. Without that tie, the certificate proves something was anodized, not that your parts were. The CNC quality reports guide lists the documents you should expect on each shipment.

Questions that expose a weak quality system

Three questions separate a real shop from a paper one. First, ask to see a sample certificate packet for a part similar to yours, redacted if needed. If they cannot produce one in a day, their quality system is aspirational. Second, ask how they handle a nonconforming part: do they isolate it, write an NCR, and notify you before disposition, or do they rework quietly and ship? The nonconformance process workflow shows what a controlled NCR looks like. Third, ask about calibration. Gauge blocks, micrometers, and CMM probes carry calibration stickers with due dates; a shop that cannot show you a calibration log is measuring parts with rulers it has not checked. None of these questions are rude. They are the same questions your customer will ask when they audit you, so you might as well ask them first. Shops that answer quickly and in writing are shops you can build a long program around; shops that deflect, delay, or promise to send paperwork later usually have nothing to send.

⚙